L4 · ToolsMemory / HBM⬦ Chokepoint

High-Bandwidth Memory (HBM)

The stacked-DRAM bottleneck that gates every AI accelerator

Map

Layers as clusters, money as arcs, brand marks on the biggest stars

AI Intelligence Graph

Starting the view

Follows the graph · 1 entity

Full file coming soon. High-Bandwidth Memory (HBM)'s links, deals and figures below are what the graph holds today.Not collected yet: 360, Money, Investors, Market share, People and hiring, Legal, News and events, Earnings calls. Anthropic is the first complete company file (people, investors, legal, hiring, birth to now); other companies follow one at a time. Open Anthropic's file

Overview

Ask the graph

answers only from the graph's sourced facts, with citations

Forecast record

No forecast published here yet. Each one names its basis and the date it resolves, is scored afterwards, and the hit rate shows here in public once the first resolves.

L4 Tools · Memory / HBM · chokepoint

High-Bandwidth Memory (HBM)

The stacked-DRAM bottleneck that gates every AI accelerator

RSS
Links
31
Deals from filings
0
Exposed if it fails
15
86 within 2 steps
It depends on
12
41 within 2 steps

No company file yet: revenue, customers and other figures appear here once they are taken from its filings.

What it is

HBM is a 3D-stacked DRAM standard (JEDEC) that stacks 8-16 DRAM dies connected by through-silicon vias (TSVs) and sits beside the GPU/ASIC on a silicon interposer, delivering the terabytes-per-second of bandwidth that transformer training and inference demand. It is the single tightest chokepoint in the AI hardware stack alongside CoWoS packaging: HBM3E is the 2024-2025 volume product and HBM4 ramps in 2025-2026 with a wider 2048-bit interface and, for the first time, a logic base die often fabbed by a foundry. Capacity has been sold out through 2025 and largely booked into 2026, with SK Hynix, Samsung, and Micron the only three suppliers on Earth.

Key facts

from its map entry
Suppliers worldwide
3 (SK Hynix, Samsung, Micron)
Current gen
HBM3E (8-hi/12-hi); HBM4 ramping 2025-2026
HBM4 interface
2048-bit (2x HBM3E), logic base die
Capacity status
Sold out through 2025, booked into 2026

Pick a link to move the graph there: · · · · · · ·

Connections31 links

Pulled 28 Oct 2026 · AI Systems Map links

Its suppliers

11

Who depends on it

14

Backed by

1

Policy

1

Compare two: what High-Bandwidth Memory (HBM) shares with another entity

Pick a second entity to see their direct links, the suppliers, backers, rivals and regulators they share, and the deals with the same parties. The graph lights the same set.

Data sources1 source

SourceFeedsData datedPulledPulled againStatus
AI Systems Map links31 links; built July 2026, deals re-checked against filings 27 to 28 Oct 2026Connections·28 Oct 2026when the map is reviewedhand-built; deals checked against filings

Times are New York time. Free sources are pulled on the schedule shown by the pipeline runner (data/corpus/run_pipelines.py), which logs every run; paid sources run only with the owner's yes; filings and newsroom pages are re-read when a new document is filed.

Links come from the AI Systems Map ontology. Deals carry the filing's own wording and a quote, checked against the document; latest source 2026-10-26. Not investment advice.